Crescent Lufkin Leader Measuring Tapes, 3/8 in x 50 ft

Crescent Lufkin Leader Measuring Tapes, 3/8 in x 50 ft
SKU: 182-HC253N
Manufacturer Part Number: HC253N
Brand: Crescent Lufkin
Manufacturers:
Best Sellers
Product Description
Specifications
Blade Finish |
Chrome Clad® |
|---|---|
Blade Length [Nom] |
50 ft |
Blade Material |
Steel |
Blade Style |
B7 |
Blade Width [Nom] |
3/8 in |
Case Material |
Vinyl-Covered Steel |
Color |
Black |
End Type |
Folding End-Hook Ring |
Graduation(s) |
1/8 in |
Increment @ Scale |
1/8 in @ 1.000 ft |
Measuring System |
Inch |
No. of Scales |
1 |
Reel Type |
Closed Reel |
Return Motion |
Manual Wind-Up |
Type |
Single Side Tape |
Wt. |
0.92 lb |
